Member Login

Log in

June 20 -- US solar company SunEdison, in partnership with utility CPS Energy, has completed a 19.8MW photovoltaic (PV) installation in Texas.  The two arrays that make up the installation are located on land at the Des Rios Water Recycling Center, owned by the San Antonia Water System. >>More

SPONSORS

Prev Next
ACORE logo HORIZ white
The American Council On Renewable Energy
 

Contact Us

  Office:
1600 K Street NW Suite 650
Washington, DC 20006
  Mail:
Mail: P.O. Box 33518
Washington, DC 20033

  E-Mail:
info@acore.org
  Phone:
1+202-393-0001