Member Login

Login to your account

Username *
Password *
Remember Me
×

Warning

JUser: :_load: Unable to load user with ID: 17160
Monday, 14 January 2013 15:24

Arizona’s Mesquite Solar On-Line, A DOE Loan Program Win Featured

Written by
Rate this item
(0 votes)

January 11 -- The 150-megawatt Mesquite Solar 1 power plant, backed by a U.S. loan guarantee, is on-line and generating clean power for thousands of homes.  >> View Article

Read 1645 times Last modified on Monday, 14 January 2013 15:41

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

SPONSORS

Prev Next
ACORE logo HORIZ white
The American Council On Renewable Energy
 

Contact Us

  Office:
1600 K Street NW Suite 650
Washington, DC 20006
  Mail:
Mail: P.O. Box 33518
Washington, DC 20033

  E-Mail:
info@acore.org
  Phone:
1+202-393-0001